Table 14 Estimated time expenditure required for data collection, by sampling design and AU, for actual distance, 3 × actual distance, and 5 × actual distance to and between clusters

From: Precision, time, and cost: a comparison of three sampling designs in an emergency setting

Administrative unit Distance assumption Sampling design Length of work day assumption
   33 × 6 design (in team days) 67 × 3 design (in team days) 30 × 30 design (in team days)  
Fur Baranga Actual distance 8.25 11.17 30.00 8.5 hr work day
Habila Actual distance 4.13 5.58 15.00 12.0 hr work day
Fur Baranga 3× Actual distance 11.00 16.75 30.00 9.5 hr work day
Habila 3× Actual distance 8.25 13.40 30.00 9.0 hr work day
Fur Barnaga 5× Actual distance 11.00 22.33 30.00 11.0 hr work day
Habila 5× Actual distance 11.00 22.33 30.00 9.5 hr work day